• Commercial Equipment Expert (Kitchen/Laundry/Supermarket) | High-Quality & Best Price
    • Tel: +86-021-5429 5560
    • FREE CONSULT >>

To ensure only the best quality products, the GHS quality control team has a strict process for each item. Before delivery, all goods put through the following process so every customer is more than happy with what they receive. The inspection process as follows:

Stainless Steel Products:

• Dimensions are checked to be sure they match the customer’s request.
• Workmanship is inspected to ensure there are no sharp corners or edges.
• A micro-ruler is to check the thickness.
• An exclusive chemical liquid is used to test the materials and make sure the product is constructed with the right material (SS201 or SS304)
• Each item is cleaned thoroughly before packing.
• Packaging is checked for conformity to meet the Standard for export packages.
• Every custom-made item is checked strictly.
• Items will be assembled to test the stability and firmness in each category.

Remark: If there is any discrepancy, our company will make corrections or improvements to meet the customer’s requirements and our level of perfection.

Refrigeration:

• Dimensions are checked to be sure they match the customer’s request.
• Workmanship is inspected to ensure there are no sharp corners or edges.
• A micro-ruler is to check the thickness.
• An exclusive chemical liquid is used to test the materials and make sure the product is constructed with the right material (SS201 or SS304)
• Each item is cleaned thoroughly before packing.
• Every item is tested by a technical machine. Items tested for include electricity leakage and high-pressure resistance.
• Inspection ensures there is no damage to the goods, and that the conformity of refrigerant, voltage and frequency are on point.
• Temperature is tested. For a chiller, the lowest temperature of 2°C should be achieved within 40 minutes after connected with electricity. For a freezer, the lowest temperature, -22°C should be achieved in 1.5 hours after connected with electricity.
• Quality control makes sure there is English manual packed along with the goods.
• All the necessary spare parts are counted and shipped along with the goods.
• Packages are checked for conformity to the standard export packaging rules.

Remark: If there is any discrepancy, our company will make corrections or improvements to meet the customer’s requirements and our level of perfection.

Electric & Gas Equipment:

• Dimensions are checked to be sure they match the customer’s request.
• Workmanship is inspected to ensure there are no sharp corners or edges.
• A micro-ruler is to check the thickness.
• An exclusive chemical liquid is used to test the materials and make sure the product is constructed with the right material (SS201 or SS304)
• Each item is cleaned thoroughly before packing.
• Every item is tested by a technical machine. Items tested for include electricity leakage and high-pressure resistance.
• Machines are checked to ensure they operate normally when connected with electricity.
• Quality control makes sure there is English manual packed along with the goods.
• All the necessary spare parts are counted and shipped along with the goods.
• Packages are checked for conformity to the standard export packaging rules.

Remark: If there is any discrepancy, our company will make corrections or improvements to meet the customer’s requirements and our level of perfection.